Project

General

Profile

Actions

Feature #4961

open

Operation sheet improvement

Added by Valérie-Emma Leroux almost 4 years ago. Updated 27 days ago.

Status:
Nouveau
Priority:
Normal
Assignee:
Category:
Sheets and tables
Target version:
Start date:
25 June 2020
Due date:
% Done:

0%

Estimated time:
Élément(s):
Opération / Operation

Description

In the top box:

  • add the commune (between the id and the operation name);
  • delete the address (which is also often a repetition of the operation name), and move it either in the location section or in the top fields of the sheet.

In the top fields, adapt the alignment of the Status field to the others.

Actions #1

Updated by Valérie-Emma Leroux almost 4 years ago

  • In the relations tab, relations between operations should be displayed either in the order in which they have been added, or in alphanumeric order; not in the reverse order of addition as it is currently.
Actions #2

Updated by Redmine Admin over 1 year ago

  • Tracker changed from Evolution to Feature
Actions #3

Updated by Étienne Loks 12 months ago

  • Target version changed from 3.0 to 4.0
Actions #4

Updated by Perrine Pautrat 27 days ago

  • Élément(s) Opération / Operation added
Actions

Also available in: Atom PDF